Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 25 results ...

Adinyira, E, Manu, P, Agyekum, K, Mahamadu, A and Olomolaiye, P O (2020) Violent behaviour on construction sites: structural equation modelling of its impact on unsafe behaviour using partial least squares. Engineering, Construction and Architectural Management, 27(10), 3363–93.

Aghimien, D O, Aigbavboa, C O and Oke, A E (2020) Critical success factors for digital partnering of construction organisations – a Delphi study. Engineering, Construction and Architectural Management, 27(10), 3171–88.

Ahiaga-Dagbui, D D, Tokede, O, Morrison, J and Chirnside, A (2020) Building high-performing and integrated project teams. Engineering, Construction and Architectural Management, 27(10), 3341–61.

Alleman, D and Lee, E (2020) Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects. Engineering, Construction and Architectural Management, 27(10), 2859–91.

Arbabi, H, Salehi-Taleshi, M and Ghods, K (2020) The role of project management office in developing knowledge management infrastructure. Engineering, Construction and Architectural Management, 27(10), 3261–87.

Bevan, W, Lu, S and Sexton, M (2020) Skills required to deliver energy efficient school retrofit buildings. Engineering, Construction and Architectural Management, 27(10), 3051–73.

Huynh, T T, Dang, C N, Le-Hoai, L, Pham, A and Nguyen, T D (2020) Proposing a strategy map for coastal urban project success using the balanced scorecard method. Engineering, Construction and Architectural Management, 27(10), 2993–3030.

Irfan, M, Malik, M S A and Kaka Khel, S S U H (2020) Effect of factors of organizational structure influencing nonphysical waste in road projects of developing countries. Engineering, Construction and Architectural Management, 27(10), 3135–53.

Kim, S Y, Nguyen, M V and Luu, V T (2020) A performance evaluation framework for construction and demolition waste management: stakeholder perspectives. Engineering, Construction and Architectural Management, 27(10), 3189–213.

Lin, Y, Guo, Y, Kim, C, Chen, P and Qian, M (2020) The impact of relational governance on the adaptability of international contractors: a comparative study between China and Korea. Engineering, Construction and Architectural Management, 27(10), 3235–59.

Liu, B, Xue, B, Meng, J, Chen, X and Sun, T (2020) How project management practices lead to infrastructure sustainable success: an empirical study based on goal-setting theory. Engineering, Construction and Architectural Management, 27(10), 2797–833.

  • Type: Journal Article
  • Keywords: Project management practice; Infrastructure sustainability; Structural equation modeling; Empirical study;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-08-2019-0463
  • Abstract:
    The sustainable success of infrastructures is becoming a driving force for advancing urbanization globally. However, to achieve infrastructure sustainable success (ISS), how project management practices (PMPs) play their role remains unexplored in current literature. To this end, an empirical study on whether PMPs play significant impacts on the accomplishment of ISS was conducted.Design/methodology/approach This research is based on an empirical survey of domestic and overseas infrastructure projects managed by Chinese companies. 162 data samples were collected and further analyzed deploying structural equation modeling (SEM) on the basis of goal-setting theory. PMP factors derived from the plan-do-check-act (PDCA) ideology, i.e. culture, strategy, implementation and reflection were hypothesized and validated to have direct and indirect relationships with ISS.Findings The results of this study indicate that both culture and reflection can directly drive the PMPs toward ISS. Furthermore, it is revealed that by affecting mediator factors of strategy, implementation and reflection, culture is found to present an indirect influence on ISS; by affecting mediator factors of implementation and reflection, Strategy is found to present an indirect influence on ISS and by affecting the mediator factor of reflection, implementation is found to present an indirect influence on ISS.Originality/value These findings contribute to the body of knowledge in measuring sustainability success of project management performances by clarifying critical relationships of how PMPs lead to ISS. Prospectively, the outputs of this research will generate informative insights for practitioners to improve their PMPs in the process of pursuing ISS in future infrastructure management practices.

Loosemore, M, Higgon, D and Osborne, J (2020) Managing new social procurement imperatives in the Australian construction industry. Engineering, Construction and Architectural Management, 27(10), 3075–93.

Olanrewaju, O I, Chileshe, N, Babarinde, S A and Sandanayake, M (2020) Investigating the barriers to building information modeling (BIM) implementation within the Nigerian construction industry. Engineering, Construction and Architectural Management, 27(10), 2931–58.

Oshodi, O, Edwards, D J, lam, K C, Olanipekun, A O and Aigbavboa, C O (2020) Construction output modelling: a systematic review. Engineering, Construction and Architectural Management, 27(10), 2959–91.

Song, Z, Yang, F, Boezeman, E J and Li, X (2020) Do new-generation construction professionals be provided what they desire at work? A study on work values and supplies–values fit. Engineering, Construction and Architectural Management, 27(10), 2835–58.

Sun, C, Xu, H and Jiang, S (2020) Understanding the risk factors of BIM technology implementation in the construction industry: an interpretive structural modeling (ISM) approach. Engineering, Construction and Architectural Management, 27(10), 3289–308.

Sun, M, Zhu, F and Sun, X (2020) Influencing factors of construction professionals’ burnout in China: a sequential mixed-method approach. Engineering, Construction and Architectural Management, 27(10), 3215–33.

Türkakın, O H, Manisalı, E and Arditi, D (2020) Delay analysis in construction projects with no updated work schedules. Engineering, Construction and Architectural Management, 27(10), 2893–909.

Tong, R, Zhang, N, Wang, X and Zhao, H (2020) Impact of safety management system on safety performance: the mediating role of safety responsibility. Engineering, Construction and Architectural Management, 27(10), 3155–70.

Vahdatmanesh, M and Firouzi, A (2020) Construction material supply risk management using Asian option contracts: the case of a pipeline project. Engineering, Construction and Architectural Management, 27(10), 3395–414.

Wang, Y, Ye, G, Zhang, Y, Mu, P and Wang, H (2020) Total factor productivity growth and its contribution: lessons from the Chinese construction industry pre- and post-2008 financial crisis. Engineering, Construction and Architectural Management, 27(10), 2911–29.

Zhang, L, Dai, G, Zou, X and Qi, J (2020) Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty. Engineering, Construction and Architectural Management, 27(10), 3095–113.

Zhang, N, Hwang, B, Deng, X and Tay, F (2020) Collaborative contracting in the Singapore construction industry: current status, major barriers and best solutions. Engineering, Construction and Architectural Management, 27(10), 3115–33.

Zhang, Q, Chong, H, Liao, P and Wan, Y (2020) Logistic regression modeling of implementation of corporate safety policy in international infrastructures. Engineering, Construction and Architectural Management, 27(10), 3031–50.

Zhang, Y, Luo, W, Shan, M, Pan, D and Mu, W (2020) Systematic analysis of PPP research in construction journals: from 2009 to 2019. Engineering, Construction and Architectural Management, 27(10), 3309–39.